WALLABY POINT RESIDENCE
Builder: Young Building
Project Size: 250sqm polish concrete slab
The owners wanted a home imbued with modernist sensibility and concrete flooring was to be a key aspect of the design. Our team delivered polished concrete floors that were both serviceable and beautiful fitting in perfectly for this contemporary residence.
THE STRAND APARTMENTS
Architect: Morris Bray Architects
Engineer: Lindsay Dynan
Developer: Pyramid Pacific
Project Size: 11 storey residential complex
The Strand is located directly opposite the popular Main Beach and is a strong presence Forster’s beachfront skyline.
Our team managed the complete concrete works for this landmark structure. Our works included 2000sqm basement slab, structural columns, 11 levels structural concrete slab, concrete roof, concrete footpaths, concrete driveway, and landscape concreting.
BLUEY'S BEACH HOUSE
Architect: Bourne Blue Architecture
Builder: Bruce Brown Building
Project Size: 120sqm
Bluey’s Beach House on the mid North coast of NSW was conceived by Bourne Blue Architecture based on a brief for simplicity, durability and authenticity.
Our team polished the Concrete Floors throughout to complement the Architects vision of a robust functional flooring solution and to resonate with the natural beauty of this beach side location.
BISHOP TYRELL AGED CARE FACILITY
Builder: Ware Building
Project Size: 5000sqm concreting works
Project Value: $11 million +
Anglican Care’s new architecturally designed complex was for the construction of a 75 bed aged care facility.
Our team’s concrete works included over 5000sqm of form works, reinforcement steel works, placement and finish of concrete slabs, concrete footpaths, concrete driveway, associated works for car parking 65 cars and landscape concreting.
ALDI SUPERMARKET
Builder: Ware Building
Project Size: 3000sqm concrete works
Construction of a new Aldi Supermarket included all concrete works by our team. Scope of works included footings, concrete columns, all form works, reinforcement steel works, placement and finish of main suspended concrete slab, back of house topping slab, concrete footpaths, concrete ramps, concrete driveway, associated works for car park and landscape concreting.
ALMA PLACE AGED CARE
Builder: Ware Building
Project Size: 8000sqm
Our team’s concrete works included over 8000sqm of form works, reinforcement steel works, placement and finish of concrete slabs, concrete footpaths, concrete driveway, associated works for car park and landscape concreting.
MANNING EDUCATION CENTRE
Architect: EJE Architecture
Builder: AW EDWARDS
Project Size: 1200sqm
Project Value: $3 million +
Our team provided concrete works for the new Medical teaching facility for the University of Newcastle.
Concrete works included reinforcement steel works, form works, structural columns, placement and finish ground floor and level 1 structural slabs, water retention tank, coloured concrete pathways, coloured concrete driveways, and car park.
The builder AW EDWARDS was awarded MBA Excellence in Construction Awards - Commercial Projects ($3.0m - $6.0m) Master Builders Association and we were proud to be a part of this project.
WATERLINE APARTMENTS
Builder: Ware Building
Project Size: 12,000sqm concreting works
Project Value: $20 million +
This beautiful coastal resort style apartment complex is set on the shore of Wallis lake.
The concrete works included 2000sqm basement slab, structural columns, 5 levels structural concrete slab, concrete footpaths, concrete driveway, pool surround and landscape concreting.
TAREE COURT HOUSE
Architect: DWP Suters
Builder: Ware Building
Project Size: 1000sqm precast walls
Project Value: $5 million +
The project for the Taree Court House Redevelopment included the construction of a two-storey building, housing the new courtroom and administrative facilities and the refurbishment of the heritage court.
Our works included manufacture and furnish 85 pre-cast panels, textured pre-cast panels, polished pre-cast panels, coloured pre-cast panels, including all installation. Providing cranes, hoisting and installation/erection equipment as needed to perform the work. Providing coordination with all other contractors through project completion.